September

1. STRUCTURE – Upper Ground suspended slab– 100% complete
结构-地上二层混凝土楼板-完成100%

2. STRUCTURE – Level 1 Zone 1 and Zone 2 near completion
结构-一楼区域1和2浇筑楼板及预制板即将完成

3. STRUCTURE – Level 2 formwork commenced
结构-二楼混凝土楼板模板开始搭建

4. Fire Sprinkler install Lower Ground
地上一层消防喷淋设备安装

5. Services rough in works Basement B1 and B2 near completion
地下室一层和二层各类管网即将安装完毕

viapac

Author viapac

More posts by viapac